3511 Stonehill Pl
Sherman Oaks CA 91423 | Prepared for JC Construction | August 3, 2026
Electrical Estimate
Itemized scope and pricing. Total
$89,000
. Carry $103,000 until the prints are read.
Electrical Timeline
Pre-construction, phased construction schedule, the roof-open interlock, and long lead items.
Solar Proposal Review
Urban Energy Solar,
$79,785
. Includes the 200 amp busbar interconnect problem that has to be settled before the service equipment is bought.
Tap a document to open or download it. Four device counts in the estimate are figures pending the electrical prints and each reads low against a 3,500 sq ft five bedroom. Revised August 3.